First Fix
The phase of construction in which concealed mechanical and electrical work - pipes, cables, ductwork - is installed before the walls and ceilings are closed in. First fix electrical includes wiring all circuits back to the consumer unit; first fix plumbing includes all supply and waste pipework to the point of connection. Second fix follows after plastering and involves fitting terminals, sockets, taps, and sanitaryware.