RQ
ResiQuote
How It WorksExtensionsRepairsPricingAdvice
Log inGet Free Quote
Home/Glossary/Accessibility / Part M
Construction & Structure

Accessibility / Part M

Building regulations Part M sets requirements for accessibility in dwellings - step-free access to the principal entrance, level thresholds, suitable circulation space, accessible WCs on the entry level, and appropriate door widths. Extensions do not automatically require full Part M compliance, but reasonable provisions for accessibility are good practice and may be required in planning conditions. Level access thresholds to bifold doors serve both accessibility and flood resistance.

Related terms

Building RegulationsBifold Doors
Acoustic Insulation

Ready to get a cost estimate?

Use ResiQuote to get a transparent, expert-backed quote for your UK home extension.

Get a Free Quote

More in Construction & Structure

  • Air Conditioning / Mechanical Ventilation
  • Balustrade / Railing
  • Bifold Doors
  • Blockwork
  • Cavity Wall
  • Ceiling Height
← Back to full glossary
RQ
ResiQuote

Expert-backed cost estimates for home extensions and repairs. Transparent, fair, and free.

Product

  • Extension Quote
  • Repair Quote
  • How It Works
  • Pricing
  • Extensions

Resources

  • Homeowner Advice
  • Glossary
  • About Us
  • Contact

Legal

  • Privacy Policy
  • Terms of Service
  • Cookie Policy

© 2026 ResiQuote. All rights reserved.

🏀 Designed and built by IG and NL ⛹️